Monthly Archives: October 2017

CONSTRUCTION UPDATES | OCT 2017

Driving down Victoria Road you get a good feel of the scale of the Tempo building. The dimensions of the site would easily be big enough for a full sized football match to be played with room for spectators. The two basement levels have had 45,000m3 of sandstone excavated and the basement construction is now complete. The building structure has reached level 4 and the first delivery of the prefabricated bathroom PODS is expected in the next month.

We have commenced the campaign for the retail spaces along Victoria Road and approaching our preferred food and beverage operators for the Church Street café and restaurant tenancies. We are focussed on attracting tenants that will be appreciated by the residents and provide alternative retail options along Victoria Road. We are hoping that you will be able to grab a coffee, lunch, a haircut, have you bike serviced and enjoy a great dinner all at your doorstep. Please let us know in the comments below what type of shops you would like to see downstairs.